~5 Hrs
Full JDE restoration validated — database recovery and web access — in approximately 5 hours.
21%
Under budget. Cost compression through precise scoping and hybrid execution methodology.
Pass
Full controlled weekend failover exercise completed successfully. Data integrity verified.
OCI
Oracle Cloud Infrastructure with RMAN replication and Cognoware backup management.
Source: Post-Engagement Results | Goldbug DR Implementation on OCI
A leading infant and children's accessories manufacturer faced significant uncertainty regarding their ability to recover JD Edwards (JDE) production services in the event of a major infrastructure failure. Having recently partnered with Allari for a successful "Lift and Shift" migration from a private cloud into Oracle Cloud Infrastructure (OCI), the client sought to further secure their operations with a robust disaster recovery (DR) solution.
Allari implemented a mirrored DR environment that transformed their theoretical continuity plan into a validated, high-availability reality. The project concluded 21% under budget and successfully demonstrated a full system restoration in approximately five hours.
Following the successful migration to OCI, the client required a formalized strategy to handle potential catastrophic failures. Three compounding risk factors were identified:
Previous disaster scenarios had required manual coordination and resulted in significant downtime. There was no automated or pre-validated recovery path — every failure scenario depended on ad-hoc human coordination under pressure.
There was a lack of confidence in backup integrity and the timing required for a full server rebuild. The organization could not answer a fundamental question: if production fails, how long until we are operational again?
Stabilization issues from the initial "Lift and Shift" initiative — such as package deployment and password failures — needed resolution before DR testing could safely begin. The DR environment could not be validated until the production foundation was fully stable.
DIAGNOSIS
No validated recovery path. Backup integrity unverified. Recovery timeline unknown. Residual technical debt from prior migration creating pre-conditions for DR test failure. Theoretical continuity plan with zero operational validation.
Building on the foundation of the successful OCI migration, Allari deployed a comprehensive DR architecture designed for seamless failover.
Created a secondary DR site within OCI featuring live replication of production databases and application servers. The DR environment mirrors production at every layer — not a degraded subset.
Utilized RMAN for data synchronization, ensuring continuous database-level replication between production and DR environments with minimal lag.
Configured Cognoware to manage backup and replication processes, providing an additional layer of data protection and recovery orchestration.
Combined structured milestone planning with flexible, real-time technical adjustments during the execution phase. The methodology adapted to the residual stabilization issues discovered during the engagement without scope creep or budget overrun.
JDE services were fully restored — including database recovery and web access — within approximately 5 hours. This is not a theoretical estimate; it is a validated, timed result from a controlled failover exercise.
Completed a full, controlled weekend failover exercise to verify data integrity and operational functionality. The DR environment handled production workload without degradation.
Delivered formal recovery procedures and escalation protocols for future response readiness. The client now possesses runbook-level documentation for executing recovery without Allari's direct involvement.
Delivered the complete solution 21% below the original budget. Cost compression achieved through precise scoping and the elimination of rework cycles during the hybrid execution phase.
"The greatest financial value of this project is not measured by what was spent, but by what future downtime may now be prevented."
While the project itself was cost-effective, the true Return on Investment lies in risk mitigation. A single major outage involving delayed order processing or operational interruption would likely exceed the total project investment many times over.
Following the successful migration and subsequent DR validation, the client now possesses the practical confidence to maintain business continuity under real-world outage conditions. The engagement converted an unquantified risk — "what happens if production goes down?" — into a documented, validated, and rehearsed answer: full restoration in approximately five hours.
The DR implementation also completes the infrastructure modernization arc that began with the initial Lift and Shift to OCI. The client's JDE environment now operates on modern cloud infrastructure with validated disaster recovery — eliminating both the platform obsolescence risk and the business continuity risk in a coordinated two-phase engagement.
Allari's Forensic Infrastructure Assessment quantifies your actual recovery timeline, backup integrity, and continuity gaps — so you know exactly what happens when production fails, before it fails.