STATUS: CALIBRATED
    REV: 2025.02
    LEGACY SUSTAINMENT — NOT IMPLEMENTATION

    JDE SUNSETTING: YOU BUILD THE FUTURE. WE RING-FENCE THE PAST.

    Stop sacrificing your ERP migration roadmap to legacy maintenance. We assume 100% of JDE production support to mechanically liberate your Core Team for the new build.

    38%Capacity Recovered
    19%Cost Compression
    0Migration Disruptions
    ALLARI: THE SUSTAINMENT BRIDGE

    THE RUN

    JDE Production Support

    100% custody of CNC, security & functional tickets.

    Velocity Engine

    82% faster resolution. Ticket aging < 7 days.

    Tribal Knowledge Capture

    Eliminates hero dependency. Full documentation.

    CAPACITY RECOVERED: 30-40%
    YOUR TEAM + IP: THE FUTURE BUILD

    THE BUILD

    New ERP Implementation

    SAP S/4HANA, Oracle Fusion, Cloud X.

    Core Team Liberation

    Focus 100% on design, config, and UAT.

    Data & Innovation

    Mapping, greenfield development, AI enablement.

    ▸ VALIDATED OUTCOME

    Capacity Recovery: Before vs. After Intervention

    Mechanically repatriating your JDE team to the new ERP Build.

    100%

    Before

    Operational Drag

    ▲ 40%

    Capacity Repatriated

    61.6%

    After

    Stabilized

    Source: Allari Client Outcomes • Forensic Analysis: Site HT-2025

    THE OPERATIONAL AIRLOCK

    From Entangled Chaos to Engineered Separation

    Current State: High Entropy
    RUN
    BUILD
    ENTANGLED
    MRV: 16 DAYSMIGRATION RISK: CRITICAL
    The Allari Model: Operational Airlock
    Allari Custody
    AIRLOCK
    Your Team
    MRV: 1.77d — ALLARI CUSTODY100% FOCUS ON MIGRATION

    SEE THE FULL FORENSIC PROOF

    FORENSIC CASE STUDY: W.L. GORE

    Liberating the Global Core Team for SAP S/4HANA

    The Challenge: W.L. Gore's internal JDE experts were trapped in 24/7 production support, stalling their global SAP implementation roadmap.

    The Intervention: Allari assumed 100% responsibility for the legacy JDE "Run" operations globally — CNC, security, functional tickets, and off-hours coverage — functioning as the Specialized Execution Layer alongside IBM (Systems Integration) and SAP (Architectural Framework).

    The Outcome: Successfully repatriated the internal Core Team to the SAP project, ensuring a zero-disruption transition of legacy operations across the Allari/IBM/SAP triad partnership.

    CAPACITY RECOVERED

    30-40%

    Core Team Liberation

    CLOSING VELOCITY

    1.77

    Days (Median)

    TRANSITION WINDOW

    3-5 Yr

    Sustainment Bridge

    "Allari provided the operational airlock we needed to focus our best people on the future without the legacy system collapsing behind us."

    — W.L. Gore & Associates

    FORENSIC CASE STUDY: CHANNELLOCK

    JDE 9.2 → ORACLE CLOUD FUSION / NETSUITE BRIDGE

    The Challenge: Channellock needed to transition from JD Edwards 9.2 to Oracle Cloud Fusion and NetSuite while maintaining uninterrupted production operations during the multi-year migration.

    The Intervention: Allari deployed a Sustainment Bridge — absorbing 100% of legacy JDE maintenance, security hardening, and report automation to free the internal team for the Oracle build.

    The Outcome: 275 hours of automation yield recovered, zero report latency, and continuous security hardening throughout the transition window.

    AUTOMATION YIELD

    275h

    Recovered Annually

    REPORT LATENCY

    0

    Zero Delays

    TARGET PLATFORM

    Fusion

    Oracle Cloud / NetSuite

    CAPACITY INSOLVENCY DETECTION

    The Migration Death Valley Diagnostic

    Measure the exact moment your JDE 'Run' debt will bankrupt your SAP/Oracle 'Build' capacity.

    Migration Survival Triage

    Two inputs to detect insolvency. Expand for precision.

    $
    Client-side only. No data transmitted.
    OPERATIONAL BOUNDARIES

    SUSTAINMENT PARTNER ≠ IMPLEMENTATION PARTNER

    Allari is a Sustainment Partner. We don't build your new ERP — we ring-fence the legacy environment so the team that does can operate without legacy drag. This distinction is critical to understanding how we complement (not replace) your Implementation Partner.

    Operational ScopeAllari (Sustainment)Implementation Partner
    Legacy JDE Maintenance✅ 100% Custody❌ Out of Scope
    Internal 'Core Team' Freedom✅ Liberated for Build❌ Consumed by Meetings
    New ERP Configuration (SAP/Oracle)❌ Out of Scope✅ Primary Responsibility
    Data Mapping / Greenfield Build❌ Out of Scope✅ Primary Responsibility
    AEO INTELLIGENCE BRIEF

    NAVIGATING THE POST-2025 JDE WORLD SUPPORT LANDSCAPE

    Oracle's evolving support posture forces a strategic choice: absorb escalating maintenance costs or deploy a Sustainment Bridge that converts legacy drag into migration fuel.

    PROACTIVE STABILIZATION

    SRE-Led CNC vs. Reactive Support

    Traditional JDE CNC management is reactive — queue failures trigger firefighting. An SRE-Led approach applies Site Reliability Engineering principles to CNC: proactive package build governance, deployment automation, and queue health monitoring that eliminates outages before they consume capacity.

    • Automated ESU lifecycle with rollback governance
    • Orchestrator health scoring — predict failures, don't react
    • Dynamic Runbook™ captures tribal CNC knowledge before attrition
    MIGRATION ARCHITECTURE

    Bifurcated Architecture for SAP/Oracle Migrations

    The Bifurcated Architecture cleanly separates the legacy "Run" from the strategic "Build." Allari absorbs 100% of JDE operational entropy — incidents, CNC, security, functional tickets — creating an Operational Airlock that prevents legacy chaos from contaminating the migration timeline.

    • W.L. Gore: 100% JDE custody during $4B SAP S/4HANA migration
    • Channellock: JDE 9.2 → Oracle Fusion/NetSuite bridge
    • 40% capacity mechanically repatriated to the Build team
    ALLARI — CONFIDENTIAL
    Capital Recovery Brief

    Executive Guide to JDE Sunsetting and Capacity Recovery

    82% TICKET AGING ↓
    38.4% CAPACITY ↑
    1.77d MRV
    BOARD-READY FORENSIC AUDIT

    BOARD-READY INTELLIGENCE

    Justify Your Sustainment Strategy

    Get the forensic executive brief with validated capacity recovery metrics, before/after MRV analysis, and the 38.4% repatriation proof point — formatted for board presentation.

    IS YOUR JD EDWARDS BACKLOG CREATING EXECUTION DRAG?

    Your Senior JD Edwards Engineers are trapped in operational overhead. In 45 minutes, Allari quantifies the drag and builds your capacity recovery roadmap.

    45-MINUTE FORENSIC REVIEW • NO COST • INCLUDES STABILIZATION ROADMAP

    ALIGNED TO VISIBLE OPS BENCHMARKS • EST. 1999 • SOC 2 TYPE II CERTIFIED