Carry a regional tax change from requirements to production setup

What changed: Allari clarified the GST requirement, tested the configuration with users and completed production setup after a database refresh required repeat validation.

A regional requirement needed coordinated delivery

A manufacturer’s Singapore operation needed its JD Edwards GST configuration prepared for an upcoming change. The requirement needed clarification, the configuration needed testing, and users needed support checking the behavior. Allari brought those responsibilities together through the 2022 delivery.

Clarify the requirement with the people using the system

Allari’s functional specialist reviewed the existing GST setup, followed up with the user and held a requirements-clarification call. The specialist then configured GST in the validation environment, tested the setup and supported user testing. These activities connected the regional business requirement to application configuration and a practical opportunity for users to check the change.

Repeat validation when the environment changes

A database refresh meant the validation setup had to be recreated. Allari configured and tested it again, then completed production setup in November. The specialist carried the requirement through the environment change and back into a tested configuration.

From regional requirement to production configuration

The customer’s requirement moved through clarification, configuration, testing and user-test support to production setup. When the environment changed, the specialist repeated the validation work before completing the production configuration.

Local expertise and language capability alongside JDE delivery

An Allari functional specialist from its local team in Asia delivered the work, bringing English and Chinese language capability alongside JDE expertise. Regional understanding and language capability sit alongside the application knowledge needed to carry the requirement through configuration, testing and production setup.

Bring the business requirement and delivery work together

Functional expertise, user coordination and testing stayed connected through the regional change. The team clarified the requirement, involved users in validation and repeated the setup and tests when the environment changed. Each stage prepared the next, from the initial question to production configuration.

Working with your team

Make the regional requirement a clear delivery plan.

Bring the application change, the people who will check it and the language your team works in. Define the specialist roles, testing and release responsibilities together.